{"id":1478,"date":"2025-12-30T12:06:59","date_gmt":"2025-12-30T16:06:59","guid":{"rendered":"https:\/\/ctes.cl\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/"},"modified":"2025-12-30T12:06:59","modified_gmt":"2025-12-30T16:06:59","slug":"mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector","status":"publish","type":"post","link":"https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/","title":{"rendered":"MOP Opens Bidding for the Second Concession of Route 57, Including the Construction of a New Tunnel in the Chacabuco Sector"},"content":{"rendered":"<p><b>This new bidding process seeks to consolidate Route 57 as a strategic corridor between Santiago, Valpara\u00edso, and Los Libertadores Pass, with investments of approximately USD 946 million and projects that envision long-term road improvements.<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The <\/span><b>Ministry of Public Works (MOP)<\/b><span style=\"font-weight: 400;\">, through the <\/span><b>General Directorate of Concessions<\/b><span style=\"font-weight: 400;\">, published in the <\/span><i><span style=\"font-weight: 400;\">Official Gazette<\/span><\/i><span style=\"font-weight: 400;\"> the bidding call for the <\/span><b>Second Concession of Route 57 Santiago \u2013 Colina \u2013 Los Andes<\/b><span style=\"font-weight: 400;\">, one of the arteries that form the backbone of transportation between the Metropolitan Region and the Valpara\u00edso Region. This initiative contemplates an estimated investment of <\/span> <b>approximately UF 23,893,000<\/b><span style=\"font-weight: 400;\">, equivalent to <\/span><b>approximately USD 946.2 million<\/b><span style=\"font-weight: 400;\">, with a <\/span><b>contractual term of 49 years (588 months)<\/b><span style=\"font-weight: 400;\">.<\/span> <\/p>\n<p><span style=\"font-weight: 400;\">The project extends along <\/span><b>approximately 116 km<\/b><span style=\"font-weight: 400;\">, covering territories of <\/span><b>Quilicura, Huechuraba, Colina, Tiltil, Rinconada, Calle Larga, and Los Andes<\/b><span style=\"font-weight: 400;\">, and aims to consolidate a <\/span><b>modern, safer, and more efficient<\/b><span style=\"font-weight: 400;\"> route for passenger and freight traffic.<\/span><\/p>\n<h3><b>Project Scope and Main Works<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The works under consideration include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Third-lane expansions<\/b><span style=\"font-weight: 400;\"> in sectors with higher demand.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><strong>New tunnel in the Chacabuco sector and rehabilitation of the existing one.<\/strong><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Improvements in urban and cross-sectional connectivity<\/b><span style=\"font-weight: 400;\">, along with paving of service roads.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>New pedestrian crossings and bike lanes<\/b><span style=\"font-weight: 400;\">, aimed at improving road safety.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Installation of electronic toll gantries<\/b><span style=\"font-weight: 400;\"> along the corridor.<\/span> <\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Additionally, the project contemplates the <\/span><b>upgrading of existing infrastructure<\/b><span style=\"font-weight: 400;\"> and the <\/span><b>creation of new connection corridors with Route 5 and the Los Andes Inland Port<\/b><span style=\"font-weight: 400;\">, with the objective of optimizing logistical and commercial flows.<\/span><\/p>\n<h3><b>Timeline and Concession Projection<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The bidding process officially began on <\/span><b>November 27, 2025<\/b><span style=\"font-weight: 400;\">, with the receipt of technical and economic proposals scheduled for <\/span><b>July 21, 2026<\/b><span style=\"font-weight: 400;\">, and opening scheduled for <\/span><b>August 18, 2026<\/b><span style=\"font-weight: 400;\">. According to the official timeline, construction is expected to begin in <\/span><b>2031<\/b><span style=\"font-weight: 400;\">, with <\/span><b>operational commencement projected for 2034<\/b><span style=\"font-weight: 400;\">.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The renewed concession will replace the current contract\u2014which concludes in <\/span><b>January 2027<\/b><span style=\"font-weight: 400;\">\u2014and seeks to address the <\/span><b>high traffic volumes<\/b><span style=\"font-weight: 400;\"> recorded on this route. This route is essential for commercial exchange with Argentina through the <\/span><b>Los Libertadores Border Complex<\/b><span style=\"font-weight: 400;\">, and its renewal contributes to strengthening <\/span><b>interregional mobility<\/b><span style=\"font-weight: 400;\">.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">With this new call, the <\/span><b>MOP advances its road infrastructure agenda<\/b><span style=\"font-weight: 400;\">, incorporating an initiative aimed at improving <\/span><b>service standards, safety, and connectivity<\/b><span style=\"font-weight: 400;\"> on a corridor critical to national development.<\/span><\/p>\n<p><a href=\"https:\/\/concesiones.mop.gob.cl\/project\/segunda-concesion-ruta-57-santiago-colina-los-andes\/\"><b>Technical Specifications Second Concession Route 57<\/b><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This new bidding process seeks to consolidate Route 57 as a strategic corridor between Santiago, Valpara\u00edso, and Los Libertadores Pass, with investments of approximately USD 946 million and projects that envision long-term road improvements. The Ministry of Public Works (MOP), through the General Directorate of Concessions, published in the Official Gazette the bidding call for [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1479,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"pmpro_default_level":"","footnotes":""},"categories":[149],"tags":[],"class_list":["post-1478","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","pmpro-has-access"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>MOP Opens Bidding for the Second Concession of Route 57, Including the Construction of a New Tunnel in the Chacabuco Sector - CTES<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MOP Opens Bidding for the Second Concession of Route 57, Including the Construction of a New Tunnel in the Chacabuco Sector - CTES\" \/>\n<meta property=\"og:description\" content=\"This new bidding process seeks to consolidate Route 57 as a strategic corridor between Santiago, Valpara\u00edso, and Los Libertadores Pass, with investments of approximately USD 946 million and projects that envision long-term road improvements. The Ministry of Public Works (MOP), through the General Directorate of Concessions, published in the Official Gazette the bidding call for [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/\" \/>\n<meta property=\"og:site_name\" content=\"CTES\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-30T16:06:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ctes.cl\/wp-content\/uploads\/2026\/04\/COLINA-scaled-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1668\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Gabriel Ingenier\u00eda Digital\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Gabriel Ingenier\u00eda Digital\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/ctes.cl\\\/en\\\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ctes.cl\\\/en\\\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\\\/\"},\"author\":{\"name\":\"Gabriel Ingenier\u00eda Digital\",\"@id\":\"https:\\\/\\\/ctes.cl\\\/en\\\/#\\\/schema\\\/person\\\/aaaf7da0becff1829946595043fe595b\"},\"headline\":\"MOP Opens Bidding for the Second Concession of Route 57, Including the Construction of a New Tunnel in the Chacabuco Sector\",\"datePublished\":\"2025-12-30T16:06:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ctes.cl\\\/en\\\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\\\/\"},\"wordCount\":375,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/ctes.cl\\\/en\\\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ctes.cl\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/COLINA-scaled-1.jpg\",\"articleSection\":[\"NEWS\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/ctes.cl\\\/en\\\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ctes.cl\\\/en\\\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\\\/\",\"url\":\"https:\\\/\\\/ctes.cl\\\/en\\\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\\\/\",\"name\":\"MOP Opens Bidding for the Second Concession of Route 57, Including the Construction of a New Tunnel in the Chacabuco Sector - CTES\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ctes.cl\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ctes.cl\\\/en\\\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ctes.cl\\\/en\\\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ctes.cl\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/COLINA-scaled-1.jpg\",\"datePublished\":\"2025-12-30T16:06:59+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/ctes.cl\\\/en\\\/#\\\/schema\\\/person\\\/aaaf7da0becff1829946595043fe595b\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ctes.cl\\\/en\\\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ctes.cl\\\/en\\\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ctes.cl\\\/en\\\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ctes.cl\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/COLINA-scaled-1.jpg\",\"contentUrl\":\"https:\\\/\\\/ctes.cl\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/COLINA-scaled-1.jpg\",\"width\":2560,\"height\":1668},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ctes.cl\\\/en\\\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/ctes.cl\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MOP Opens Bidding for the Second Concession of Route 57, Including the Construction of a New Tunnel in the Chacabuco Sector\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ctes.cl\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/ctes.cl\\\/en\\\/\",\"name\":\"CTES\",\"description\":\"Expertise in tunnel construction and underground space development in Chile, ensuring safety, innovation, and sustainability for all infrastructure projects.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ctes.cl\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ctes.cl\\\/en\\\/#\\\/schema\\\/person\\\/aaaf7da0becff1829946595043fe595b\",\"name\":\"Gabriel Ingenier\u00eda Digital\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/592853c43b67bf6bafb429da024287cb9d70d861e6329f1774dfca6676c3b395?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/592853c43b67bf6bafb429da024287cb9d70d861e6329f1774dfca6676c3b395?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/592853c43b67bf6bafb429da024287cb9d70d861e6329f1774dfca6676c3b395?s=96&d=mm&r=g\",\"caption\":\"Gabriel Ingenier\u00eda Digital\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"MOP Opens Bidding for the Second Concession of Route 57, Including the Construction of a New Tunnel in the Chacabuco Sector - CTES","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/","og_locale":"en_US","og_type":"article","og_title":"MOP Opens Bidding for the Second Concession of Route 57, Including the Construction of a New Tunnel in the Chacabuco Sector - CTES","og_description":"This new bidding process seeks to consolidate Route 57 as a strategic corridor between Santiago, Valpara\u00edso, and Los Libertadores Pass, with investments of approximately USD 946 million and projects that envision long-term road improvements. The Ministry of Public Works (MOP), through the General Directorate of Concessions, published in the Official Gazette the bidding call for [&hellip;]","og_url":"https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/","og_site_name":"CTES","article_published_time":"2025-12-30T16:06:59+00:00","og_image":[{"width":2560,"height":1668,"url":"https:\/\/ctes.cl\/wp-content\/uploads\/2026\/04\/COLINA-scaled-1.jpg","type":"image\/jpeg"}],"author":"Gabriel Ingenier\u00eda Digital","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Gabriel Ingenier\u00eda Digital","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/#article","isPartOf":{"@id":"https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/"},"author":{"name":"Gabriel Ingenier\u00eda Digital","@id":"https:\/\/ctes.cl\/en\/#\/schema\/person\/aaaf7da0becff1829946595043fe595b"},"headline":"MOP Opens Bidding for the Second Concession of Route 57, Including the Construction of a New Tunnel in the Chacabuco Sector","datePublished":"2025-12-30T16:06:59+00:00","mainEntityOfPage":{"@id":"https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/"},"wordCount":375,"commentCount":0,"image":{"@id":"https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/#primaryimage"},"thumbnailUrl":"https:\/\/ctes.cl\/wp-content\/uploads\/2026\/04\/COLINA-scaled-1.jpg","articleSection":["NEWS"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/","url":"https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/","name":"MOP Opens Bidding for the Second Concession of Route 57, Including the Construction of a New Tunnel in the Chacabuco Sector - CTES","isPartOf":{"@id":"https:\/\/ctes.cl\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/#primaryimage"},"image":{"@id":"https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/#primaryimage"},"thumbnailUrl":"https:\/\/ctes.cl\/wp-content\/uploads\/2026\/04\/COLINA-scaled-1.jpg","datePublished":"2025-12-30T16:06:59+00:00","author":{"@id":"https:\/\/ctes.cl\/en\/#\/schema\/person\/aaaf7da0becff1829946595043fe595b"},"breadcrumb":{"@id":"https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/#primaryimage","url":"https:\/\/ctes.cl\/wp-content\/uploads\/2026\/04\/COLINA-scaled-1.jpg","contentUrl":"https:\/\/ctes.cl\/wp-content\/uploads\/2026\/04\/COLINA-scaled-1.jpg","width":2560,"height":1668},{"@type":"BreadcrumbList","@id":"https:\/\/ctes.cl\/en\/mop-opens-bidding-for-the-second-concession-of-route-57-including-the-construction-of-a-new-tunnel-in-the-chacabuco-sector\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ctes.cl\/en\/"},{"@type":"ListItem","position":2,"name":"MOP Opens Bidding for the Second Concession of Route 57, Including the Construction of a New Tunnel in the Chacabuco Sector"}]},{"@type":"WebSite","@id":"https:\/\/ctes.cl\/en\/#website","url":"https:\/\/ctes.cl\/en\/","name":"CTES","description":"Expertise in tunnel construction and underground space development in Chile, ensuring safety, innovation, and sustainability for all infrastructure projects.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ctes.cl\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/ctes.cl\/en\/#\/schema\/person\/aaaf7da0becff1829946595043fe595b","name":"Gabriel Ingenier\u00eda Digital","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/592853c43b67bf6bafb429da024287cb9d70d861e6329f1774dfca6676c3b395?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/592853c43b67bf6bafb429da024287cb9d70d861e6329f1774dfca6676c3b395?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/592853c43b67bf6bafb429da024287cb9d70d861e6329f1774dfca6676c3b395?s=96&d=mm&r=g","caption":"Gabriel Ingenier\u00eda Digital"}}]}},"_links":{"self":[{"href":"https:\/\/ctes.cl\/en\/wp-json\/wp\/v2\/posts\/1478","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ctes.cl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ctes.cl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ctes.cl\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ctes.cl\/en\/wp-json\/wp\/v2\/comments?post=1478"}],"version-history":[{"count":0,"href":"https:\/\/ctes.cl\/en\/wp-json\/wp\/v2\/posts\/1478\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ctes.cl\/en\/wp-json\/wp\/v2\/media\/1479"}],"wp:attachment":[{"href":"https:\/\/ctes.cl\/en\/wp-json\/wp\/v2\/media?parent=1478"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ctes.cl\/en\/wp-json\/wp\/v2\/categories?post=1478"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ctes.cl\/en\/wp-json\/wp\/v2\/tags?post=1478"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}